Receiving Requisitions
Trang 1 trong tổng số 1 trang
Receiving Requisitions
Quality standard
All items received from the storeroom should be within the standard specification of the item in quality, as specified in the requisition form.
Procedures
1. Got to the storeroom at the start of the shift, to collect items requisition. Use a trolley as required, to ensure items are transported safety and quickly.
2. Obtain the requisition form from the storekeeper.
3. Check the items requisitioned are complete.
4. Check the quality, quantity of each item, and the packing size (unit of measure)
5. Collect all items.
6. Sign on the requisition form, acknowledge receipt of the items, and get the third copy of the requisition form.
7. Load items on the trolley.
8. Move items into the outlet.
9. Store newly requisitioned items in the cabinet.
All items received from the storeroom should be within the standard specification of the item in quality, as specified in the requisition form.
Procedures
1. Got to the storeroom at the start of the shift, to collect items requisition. Use a trolley as required, to ensure items are transported safety and quickly.
2. Obtain the requisition form from the storekeeper.
3. Check the items requisitioned are complete.
4. Check the quality, quantity of each item, and the packing size (unit of measure)
5. Collect all items.
6. Sign on the requisition form, acknowledge receipt of the items, and get the third copy of the requisition form.
7. Load items on the trolley.
8. Move items into the outlet.
9. Store newly requisitioned items in the cabinet.
Trang 1 trong tổng số 1 trang
Permissions in this forum:
Bạn không có quyền trả lời bài viết